About Gallery  
  WorkAtHeight Equipment  
  Innovations References  
  Services Contact  
   
design by Studio Maxell

PRO INDUSTRY doo is a company from Novi Sad, which specializes in rope access high level work. The company includes a multi-disciplined team of experienced rope access technicians, who are qualified to carry out a wide variety of tasks such as waterproofing, welding, lead work, painting, sandblasting, cleaning, repairs, etc. Our field workers possess safety and protection at work certificates and are equipped with professional equipment for working in difficult to access areas and sometimes harsh environments, such as confined spaces and high level access structures. PRO INDUSTRY team also provides building consulting services, which include finding solutions, conducting structural surveys, choosing the adequate materials and methods, and many more.

Due to our "safe and efficient" work policy and careful selection of professional equipment and materials of the most respectable manufacturers (PETZL, Beal, LANEX, SIKA, KEMA, Hilti, Still, Kercher, Dr. Schnell, PREMIER, Tarco, etc.), we have grown to become one of the best known names in the field of industrial rope access with a reputation for high quality‚ professional work and innovative solutions to difficult access problems. With constant innovations our company strives to increase productivity and services. This is why we invest in extending our employees’ qualifications (supporting rope access technicians to acquire IRATA certificates, attending building and construction seminars), taking part in international fairs, purchasing professional equipment and materials, protecting company employees according to EU safety standards, conducting market research surveys thus producing a long line of satisfied clients.

Furthermore, the policy of our company has always been focused on minimising the harmful effects on the environment, so we have decided to use environmental-friendly chemicals, which possess necessary EU certificates and meet local Municipal Bureau of Public Health HACCP quality standards.

--------------------------------------------------------------------------------------------------------------------------------

ROPE ACCESS

Rope access or industrial abseiling provides an innovative new approach to high level access work using a specially designed industrial rope, which allows fast, efficient, safe and cost effective way of conducting a comprehensive range of tasks in difficult to access areas and sometimes harsh environments, such as confined spaces and high level access structures. Rope access requires highly skilled technicians to carry out a wide variety of industrial rope access projects, working in a multitude of industry sectors including construction, maintenance, preservation, building consulting, etc.

Nevertheless, rope access is a safe and even money- and time-saving alternative to scaffolding or powered access. Due to the flexibility in rope access techniques all equipment including ropes are removed at the end of each working day, eliminating potential security risks as well as more general health and safety concerns otherwise related with scaffolding and powered access. Unlike powered access rope access do not need a large flat, open area beneath the work site. The true benefits of rope access are realised when the current cost to access an area is disproportionate to the amount of work that has to be carried out, meaning that rope access can often accomplish in hours, work that previously took days to complete using scaffolding and scaffolding towers.

Powered Access

Industrial Rope Access

Set up

 2 hours

Set up

 0.5 hours

Task Time  

 3 hours

Task Time

 3 hours

Dismantle and clear site

 2 hours

Dismantle and clear site

 0.5 hours

Total

 7 hours

Total

 4 hours

Scaffolding

Industrial Rope Access

Erection

 24 hours

Set up

 1 hours

Task Time

 8 hours

Task Time

 8 hours

Dismantle and clear site

24 hours

Dismantle and clear site

 1 hours

Total

 56 hours

Total

 10hours

-------------------------------------------------------------------------------------------------

 
BIRD PROOFING

Every year we tend to introduce innovations in the range of services our company provides, so that we can efficiently meet the needs of our clients. According to the recent scientific surveys, apparently harmless city birds can become dangerous pests, especially to people’s health. Bird habitats are not only well known sources of unpleasant smell and damage to the aesthetic appearance of residential and business structures, but are also the convenient environment for micro organisms that can cause serious health problems among humans (e.g. Salmonella bacteria which causes diarrhoea, nausea, fever and other symptoms of toxic shock; ornithosis is a 'flu-like' respiratory disease most commonly found in pigeon droppings; fungal infections; etc.). Wet bird droppings are very slippery and can be dangerous where the public has access. Bird droppings have an acidic content, which is corrosive to paintwork and masonry, and in some circumstances, it has been known that the sheer weight of bird fouling can lead to roofs and ceilings collapsing.

Considering these facts, our company has recently started to provide bird proofing service. We offer bird netting and bird spikes as the best and cost effective solutions against any of the urban pest birds. Nets can be fitted horizontally to exclude pest birds from open areas such as walls and courtyards. They can also be fitted vertically to proof large frontages of buildings. A combination of horizontal and vertical fitting nets can be used to proof installations such as air conditioning units on roofs.

The appearance of the model type PG (Bird Spikes):

Bird Spikes are the optimal solution for professional bird proofing, which simply prevents and keeps birds from landing on the protected areas of  building facades. The product is made of quality materials, in about dozen forms, which provides effective facade protection , very long durability with emphasis on high transparency in order to keep the building aesthetic appearance unharmed.

Bird spikes can protect entire buildings or parts of buildings (usually only the front side is protected) in which case it should be taken into consideration that birds will move to another place without protection (usually on the roof of the building)

Assembled elements are very discrete, almost invisible. Installation is simple with a neutral silicon glue or screws and applicable on a variety of surfaces, such as metal, stone, concrete, brick, wood, plaster, painted surfaces, etc..

The system is in accordance with environmental regulations and does not bring harm to  birds.

Elements are manufactured in about dozen forms depending on the width of the surface.

Description of materials, material characteristics, material resistance, installation surfaces and assembly conditions.

Elements consist of:

Made of one of the highest quality, weather resistant, UV stabilized plastics, which provides a stable holding for spikes and is also very flexible which allows bending required for  adaptation on various forms of facade ornaments.

Spikes are bent under certain angle in order to maintain flexibility and also security of the birds. There are ten different forms which can protect overhangs of different width, from 20 mm to 170 mm wide. With multiple rows of elements it is possible to protect a wider area.

  Spikes cannot rust and do not leave any traces on the facade. The appearance is unobtrusive, hardly noticeable to passers by. The hight of spikes varies from 100 mm to 130 mm in specific places.

Product Resistance

- Resistant to the atmospheric elements, UV radiation, alkaline salts, different colors and paints


Installation surfaces

- Concrete, ferro cement, cement plaster, lime plaster
- Marble, natural stone (and various types of stone), brick
- Wood, painted furniture
- Copper, brass and other colored metals that are used in the construction
- Galvanized sheet, painted plates, plastic materials, etc..

Surface preparation

- Clean out of dirt by dusting  and degreasing of surface
- Surface should be dry if the installation is done with silicon glue
- On  very porous surfaces a flattening mass should be used first

Installation of elements

- Silicon glue (approximately 310 ml for 15 meters)
- With screws or nails, 4 pieces per meter

Optimal conditions for installation

- Air temperature from +5 to +30 °C
- Dry without precipitation

-------------------------------------------------------------------------------

Our company provides a wide variety of services for all types of industrial, commercial, business and housing facilities, as well as buildings and structures that are a part of cultural heritage.

FINAL CONSTRUCTION WORKS AND REPAIRS

• hydro-isolation (waterproofing)
• thermal-isolation
• joist sealing
• fire protection
• masonry  painting and repair works
• welding, painting and sandblasting (anticorrosive protection)  of steel constructions
• deformation measuring and damage assessment of structures

MAINTENANCE AND PROTECTION

• external maintenance of facilities (high pressure water jetting and glazing of   window area and facades)
• cleaning and maintenance of ventilation shafts and roofs (kennels and roof cover)
• cleaning and maintenance of  chimneys, tanks and silos
• gutter and drain clearance
• removal of dangerous parts of the facade and rocks from the traffic sections
• bird deterrent, netting and spiking
• lattice protection

ASSEMBLING AND DIASSEMBLING WORKS

• light steel structures
• facade panels
• billboards, panels and neon banners erection
• air-conditioning, lightning rods, antennas, outdoor sewage systems, etc.
• celebration and holiday decorations

---------------------------------------------------------------------------------



----------------------------------------------------------------------------------------------------

 

Development direction of Pro Industry Ltd., worked through the cooperation and exchange of business experiences with successful companies in Serbia. Our reference list illustrates realization with numerous and long-term business partners:

 

HIGH LEVEL SURFACE CLEANING AND HIGH PREASURE (HP) CLEANING

1. Nis Naftagas, Novi Sad 15. Faculty of Philosophy, Novi Sad 29. Oriflame, Belgrade 43.Ministry of Finance - Treasury, Belgrade
2. SPENS, Novi Sad 16. Kindergarten „Anđeo čuvar“, Novi Sad 30. Jumbes Bank, Belgrade 44.’’Fresenius Medical Care’’, Belgrade
3. Hotel „Park“, Novi Sad 17. DMS Group, Novi Sad 31. Alpha Bank, Belgrade 45.’’Pharma Swiss’’, Belgrade
4. Meridian Bank, Novi Sad 18. Greping, Novi Sad 32. Verano Motors, Belgrade 46.’’Sladara Maltinex’’, Bačka Palanka
5. Business-Trade Center ,,Dalton’’, Novi Sad 19. Nis Jugopetrol, Belgrade 33. Clinical center, Kraljevo
6. Business-Trade Center ,,Olimp’’, Novi Sad 20. Sava Centar, Belgrade 34. Hospital, Soko Banja  
7. Business-Trade Center „Pariski Magazin“, Novi Sad 21. Velefarm, Belgrade 35. Hotel ,,Šumadija’’, Vrnjačka Banja  
8. Volks Bank, Novi Sad 22. PIO, Belgrade 36. RDA, Belgrade  
9. BB Minaqua, Novi Sad 23. Škoda, Belgrade 37.’’Prezident’’ Hotel, Novi Sad  
10. Vojvodina County Hall, Novi Sad 24. Luk Oil, Belgrade 38.’’United Serbian Breweries’’, Novi Sad  
11. Town Hall, Novi Sad 25. Jkp Za Sklonište, Belgrade 39.Faculty of Sport and Recreation, Novi Sad  
12. Hotel ,,Panorama’’, Novi Sad 26. Holiday In, Belgrade 40.’’Planeta Sport’’, Novi Sad  
13. Faculty of Science, Novi Sad 27. Casino Beograd, Belgrade 41.’’Hyundai’’, Belgrade  
14. Faculty of Law, Novi Sad 28. YU Point, Belgrade 42.Economic Advisor, Belgrade  

 

FINAL CONSTRUCTION WORKS AND REPAIRS

1. ,,Đuro Strugar’’, Kula (silo cracks hydroisolation)
2.Vital A.D., Vrbas (ultrasonic measurment of silo walls, protection of lightning-conductor instalations and chimeny repairworks )
3. Synod Church, Novi Sad (inspection of roof cover)
4.Residential building, Novi Sad, Jovana Dučića st. 17 (facade reconstruction and painting)
5. Residential building, Novi Sad, Branimira Ćosića st. 42 (hydroisolation of facade joints)
6. Residential building, Novi Sad, Balzakova st. 64 (hydroisolation of facade joints)
7. Residential building, Novi Sad, Oslobodjenje Boulevard 43 (hydroisolation of facade joints)
8. Residential building, Novi Sad, Beogradski kej st. 45 (hydroisolation of facade joints and removal of dangerous parts of facade )
9. Residential building, Novi Sad, Rodoljuba Čolakovića st. 10 (hydroisolation of facade joints)
10. Residential building, Novi Sad, Futoška st.1a (hydroisolation of facade joints)
11.Residential building, Novi Sad, Oslobodjenje Boulevard 19/26 (removal of dangerous parts of facade, hydroisolation and painting)
12. Residential building, Novi Sad, Cara Lazara Boulevard 81 (hydroisolation of facade joints)
13. Residential building, Novi Sad, Fruškogorska st. 6 (hydroisolation of facade joints)
14.County road, Risan-Žabljak (removal of dangerous rocks from traffic sections)
15.Regional road, Tara canyon (removal of dangerous rocks from traffic sections)
16.Residential building, Novi Sad, Despota Stefana Blvd. 18 (cleaning and painting of window frames)
17.Residential building, Novi Sad, Oslobođenje Blvd. 30a (facade reconstruction and painting)
18.Residential building, Novi Sad, Narodnog fronta St. 65 (isolation of roof atics)
19.Residential building, Novi Sad, Valentina Vodnika St. 10 (roof and gutter system inspection and cleaning)
20.Residential building, Novi Sad, Kralja Aleksandra St. 6 (old plaster removal and ’’demit’’ facade system setting)
21.Residential building, Novi Sad, Kraljevića Marka St. 60 (cleaning and painting of window frames)
22.’’Sava Center’’, Belgrade (window panel joints cleaning and sealing)
23.Ministry of Finance - Treasury, Belgrade Pop Lukina St. 7-9 (facade reconstruction and painting)
24.’’Danubius AD’’, Novi Sad (internal silo cleaning and paint coating)
25.’’Sladara Maltinex’’, Bačka Palanka (gutter system fixing)
26.’’Žito Bačka’’, Kula (old plaster removal from silo machine house)

 

ASSEMBLING AND DIASSEMBLING WORKS

1. Petrovaradin Fortress, Novi Sad (design, manufacture and assembly of protection fence)
2. Business-Trade New Nork, Novi Sad (assembly of advertisement panel)
3.PMF, Novi Sad (fixing of existing and manufacturing and installation of new facade panels and setting spike protection from birds)
4.Meridian Bank, Novi Sad (fixing of facade panels)
5. Scorpion, Novi Sad (assembly of advertisement panel)
6.Marcons, Novi Sad (assembly of advertisement panels: Dnevnik, Panonska bank, FK Vojvodina Stadium, Caffe BBRB, AMS Srbije...)
7. Uspenska Church, Novi Sad (diassembling of cross from church tower)
8. Sladara Maltinex ad, Bačka Palanka (bird protection setting)
9.Highway E75, Lapovo (assembly of advertisement panel)
10.Lab-Set DOO, Novi Sad (assemly of air conditioner)
11.Agency ,,Link’’, Novi Sad (manufacture and assembly of reflector construction)
12. Residential building, Novi Sad, Narodnog Fronta st. 72 (replacement of roof gutter system)
13. Residential building, Novi Sad Jovana Dučića st. 17 (bird protection setting)
14. Residential building , Novi Sad Balzakova st. 64 (cleaning of fire-escape stairways and bird protection net setting)
15. Residential building, Novi Sad Futoška st. 1a (assembly of window frames and facade panels)
16. ITD Group, Novi Sad (assembly of external sewage system)
17. ITD Group, Novi Sad, (manufacture of safety system and anchor points on artificiall rock)
18. Globos Insurance, Novi Sad (disassemby of advertisement billboard)
19. ’’Serbia’’ Hotel, Vršac (disassemby of advertisement panel)
20. Residential building, Novi Sad Slobodana Jovanovića Blvd. 20 (bird protection setting)
21. ’’Ratko Mitrović’’, Belgrade (bird protection setting)
22. Uspenska Church, Novi Sad (church cross assembly)
23. ’’Pharma Swiss’’, Belgrade (panel fixing)
24. ’’Danubius AD’’, Novi Sad (replacement of roof gutter system)
25. Several buildings in Gospodar Jevremova St., Šabac (bird protection setting)
 

---------------------------------------------------------------------------------------------------------------------------------------------------------

PRO INDUSTRY doo
Director and owner: Jovan Brkić
Adress: Hadži Ruvimova 20, 21 000 Novi Sad
Tel:  +381216775340
Fax: +381216775341
Work time: 9-17h
Technical support: +381643653012
e-mail: office@proindustry.co.rs
web: www.proindustry.co.rs

---------------------------------------------------------------